Retour au Catalogue

KSC-01pp1636

Amas Globulaire

Vue détaillée de KSC-01pp1636

Description

KENNEDY SPACE CENTER, Fla. -- Solar arrays part of the payload for the Hubble Servicing Mission, STS-109, await processing in the Vertical Processing Facility. The primary servicing tasks of the mission are to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys, install the NICMOS Cooling System, and install New Outer Blanket Insulation on bays 5 through 8. Mission STS-109 is scheduled for launch in mid-February 2002

Données Techniques

Type d'Objet :
Amas Globulaire
Date de Publication :
2026-03-16